Klargester
Clearwater 1250L Single Grinder Pumping Station (DPSA-C)
Clearwater 1250L Single Grinder Pumping Station (DPSA-C)
Prices are EX VAT unless stated otherwise
Couldn't load pickup availability
The Clearwater 1250L Single Grinder Pump Station is manufactured from super-tough, low-maintenance GRP, and engineered with the highest quality parts and fittings. It is also appropriate where 24 hour storage requirements need to be maintained, Ideal for homes or properties.
Product Ref: C - Grinder - 230v, 8.2A FLC, 38A Start, 1.8kW - Single
Klargester Pump Station Brochure
Klargester GRP Pump Station Drawing
Product Benefits
- Made with super-tough, low maintenance GRP for guaranteed durability.
- Supplied with control panel with options for remote monitoring system.
- Designed with easy access features for maintenance.
- Choose from either 110mm or 160mm inlet connections.
- Lockable covers for optimum security.
- Quick connection outlet couplings.
- Reliable performing stainless steel submersible Grundfos pumps
Key Factors to size your Pump Stations
To size your pump stations they key factors to take into consideration are below
- Application: domestic, residential or commercial.
- Material application: sewage, effluent or surface water.
- Inlet depth (below ground level).
- Pumping distance and lift.
- Electrical supply.
If you require assistance with sizing your Pump station, please give our friendly team a ring on 01872 228447
Delivery
Our shipping costs cover most of the UK - however, parts of England, Scottish Highlands and Islands including areas north of the Glasgow / Edinburgh border, Isle of Wight, Channel Islands, Isle of Man, Anglesey, Western Isles, Shetland Islands, Orkney Islands, Isles of Scilly, Northern Ireland and the Republic of Ireland may cost more.
Please call before ordering if the delivery postcode is listed below. There may be additional shipping costs. AB, BT, CA, CT, DD, DG, EH, FK,G, GY, IM, IV, JE, KA, KW, KY, LD, LL, ML, PA, PH, PO 30-41 (Isle of Wight), SA, SY, TD, TN, TR, ZE Southern Ireland
Our lead times should only be used as a guide and are subject to change.
Offloading
Unless a hi-ab delivery has been booked at additional cost, it is the customer's responsibility to offload with suitable equipment on the day of delivery and a failed delivery may result in additional charges.
We recommend installers and/or plant hire & materials for install such as excavators, aggregates etc are not booked until you are in receipt of the goods. Waterwise Pumps cannot be held responsible for costs incurred due to unforeseen delays, please see our terms for more details.
Share
